RESUME
Name:
Daryl Crockett
623 E. Raven Way
Gilbert, Az. 85297
480-353-7970
EDUCATIONAL DETAILS
§ Qualifications:
ú
Project
Manager, Outside Plant/Inside Plant (OSP/ISP) engineer, design and review,
QA/QC and Safety, material procurement, cost estimates and bids.
Knowledgeable in Government and Military standards
having worked on Government contracted projects as Lead QA/QC. Knowledgeable
in telecommunication and electrical industry standards: ANSI, TIA-EIA, RUS,
NEC and BICSI best industry practices and standards. Experienced with
OSP/ISP, fSona (free space Optics), MMW, and DWDM implementations (Army I3MP
Projects). Computer Proficient: Microsoft Office, Word, Excel, PowerPoint,
Access, Outlook, and AutoCAD (2010LT). Bilingual: English, Japanese.
High Integrity. Perform Under Pressure. Dependable.
Excellent interpersonal and professional skills.
ú
Education
and Training: General studies at Chandler Gilbert Community College. BICSI
DD102 and 200 in preparation for RCDD exam. Preparation for PMP
certification: Aruba, Redline 802.16, LOEA MMW
ú
Certifications:
Hilti Fire Stop, First Aide /CPR, Hoffman Construction Corporation, MYR Group
Project Management Training, Belden-KRONE CCS, Franklin Quest Time Management
Seminar, Confined Space, fSONA Optical Wireless, LOEA L2500 Radios
WORK
HISTORY
June 2012 – November
2013
Lotus Technical
Services
Project Manager
§ Responsibilities:
ú
Contracted
to Intel for Tool Shutdown Coordination for electrical upgrades in Fab12 and
Fab22/32. Verification of subcontractor assessment walks to panel matrix,
update panel schedules. Field walks when discrepancies were noted and
resolved with subcontractor.
ú
Contracted
to Hoffman Construction Group (Intel Fab 42 Project). Planning and scheduling
day to day operations of the Lotus TS technicians with the respective Hoffman
construction manager (CM). Worked with team members to perform QA/QC and
Commissioning duties for Electrical (OAT and startups), LSS, I&C and
Telecomm disciplines. Submitted daily reports to the CM.
November 2011 – May 2012
Black Box Network
Services
Project Manager
§ Responsibilities:
ú
Project
Manager Fab12 P1270 Project, Project Recovery, and Customer interface with
both the General Contractor and Customer (Intel-Ocotillo), material
procurement, manpower requirements. Daily reports, meetings, and multiple
weekly schedule updates. Outside and Inside (OSP/ISP) infrastructure
implementation of fiber optic and copper cat5e cable. Major milestones and cutover
deadlines. Sustaining contract projects, day to day operations, manpower
needs, material procurement, RFP/RFQ bidding and estimating, billing and
invoicing.
June 2011 – November
2011
Adecco (Contracted Black
Box) Project Manager
§ Responsibilities:
ú
Project
Manager Fab12 P1270 Project, Project Recovery, and Customer interface with
both the General Contractor and Customer Owner (Intel-Ocotillo), material
procurement, manpower requirements. Daily reports, daily meetings, multiple
weekly schedule updates. Outside and Inside (OSP/ISP) infrastructure
implementation of fiber optic and copper cat5e cable. Major milestones and
cutover deadlines.
November 2009 – May
2011
STG – Hawaii, Pacific Theater
Senior IT Technologist
§ Responsibilities:
ú
OSP
Engineer; design and review of OSP infrastructure for projects within
USARPAC. Knowledgeable with AutoCAD LT 2010 for the design of OSP/ISP
projects. (Pacific Theater - S. Korea, Japan, Alaska and Hawaii)
July 2006 – October
2009
GAITS – Hawaii, Pacific
Theater
Senior IT Technologist
§ Responsibilities:
ú
Lead Quality
Assurance/Quality Control for US government I3MP project for Department of
the Army.
ú
Daily
inspections of OSP, ISP, and Wireless (FSO, MMW, 802.16). Ensure
contractor followed requirements of the contract and U.S. Government: daily
logs, weekly reports, interfacing with General Contractor, subcontractors,
and Base Department of Information Management (DOIM) contacts. Site surveys
and VSS prior to implementation, experience with review and field design
changes of OSP/ISP engineered drawings, update as builds of OSP/ISP drawings.
Knowledgeable in all phases of design criteria and proficient with AutoCAD
and computer technologies.
ú
Assignments
include Schofield Barracks Enclave and Ft. Shafter Enclave, Oahu, and
Pohakuloa Training Area, Big Island, Hawaii, Kwajalein Atoll, Marshall
Islands.
January 2006 – March
2006
Federal Communications
Group
Project Manager
§ Responsibilities:
ú
Project
Manager contracted to Intel Corp. Project was canceled prior to
construction. Assisted with RFP, bidding and estimating.
March 2006 – July 2006
&
Applied Quality Communications Inc.
Senior IT Technologist
February 2004 – December 2005
§ Responsibilities:
ú
Lead
Quality Assurance/Quality Control for US government I3MP project for
Department of the Army.
ú
Daily
inspections of OSP, ISP. Verify contractor met requirements of contract
and U.S. Government: daily logs, weekly reports, interfacing with General
contractor, subcontractors, and Base Department of Information Management
contacts. Review of OSP/ISP engineered drawings, as builds of OSP/ISP
drawings. Site surveys and VSS prior to implementation, review and field
design changes of OSP/ISP engineered drawings, update as builds of OSP/ISP
drawings. Knowledgeable in all phases of design criteria and proficient with
AutoCAD and computer technologies
ú
Assignments
include Seoul, South Korea, (Camp Yongson and Camp Carroll), Okinawa, Japan,
(Torii Sta., Ft. Buckner, Naha Port) and Oahu Hawaii, (Schofield Enclave).
ú
In
Okinawa, utilized my fluency in Japanese to ensure subcontractors’
understanding of work requirements. Assigned as Lead QA for Okinawa and
Schofield Enclave, HI Projects.
January 2003 – February
2004
Self-Employed
§ Responsibilities:
ú
Installation
of carpet and tile floors, small remodels, framing, electrical, and drywall.
ú
Contracted
to Whitewater Technologies for telecommunication upgrades of Circuit City
stores in Tucson and Phoenix metro areas.
February 2002 – December
2002 MasTec Network
Services
Project Manager
§ Responsibilities:
ú
Arizona
schools Wiring Upgrades project.
ú
First
Union-Wachovia Bank merger, Florida.
ú
Installation
of P.O.S. for new Del Taco franchises in Arizona.